Guidelines For New Development
Guidelines For New Development including Water Plan Check Fees, Sewer Plan Check Fees, Water Inspection Fees, Sewer Inspection Fees, and Construction Water Costs.
Guidelines For Tenant Improvements requirements for Tenant Improvements (T.I.s). Specific Requirements For Food Service Establishments, Manufacturing Facilities, and Industrial (T.I.s ) are included.
Applications (Downloads)
Plan Check Application
- Must be filled out at Public Counter
GENERAL REQUIREMENTS FOR NEW DEVELOPEMENT:
The following plans and information will be required at the time of first submittal: (Incomplete submittals will not be accepted)
- Water Improvement Plans (2 sets)
- Water Flow Calculations (2 sets)
- Fire Flow Requirements / Plans from Fire District
- Tract or Parcel Map
- Title Report (not less than 6 months)
|
- Sewer Improvement Plans (2 sets)
- Sewer Flow Calculations (2 sets)
- Grading Plans
- Street Improvement Plans
- Storm Drain Plans
|
Standard Specs and Standard Drawings
Maps and Boundaries
Last updated: 3/22/2010 2:14:37 PM